• Skip to main content
  • Skip to footer

Matt WandererMatt Wanderer

The online home of Matt Wanderer

  • Home
  • About
  • Blog
  • Contact

September 19, 2022 by admin

SEIA Roadmap to 50 GW

SEIA Roadmap to 50 GW

The SEIA released a roadmap to 50 GW of manufacturing backed by an American supply chain and American jobs. As we move into the future of the green grid, resiliency can only been achieved by expanding domestic industry and domestic jobs.

Filed Under: Blog

Footer

Download Press Kit

Copyright © 2023 Matt Wanderer. All Rights Reserved.